Tell us about your day
When do customers arrive, and how many people must be available even when it's quiet?
Don't include opening preparation or closing cleanup in your public hours. You'll add that work below.
List the work that needs doing
Start with a few everyday activities. Tap any row to expand it and edit. Add as many as you need.
| Activity (tap to edit) | When | Labor-hours |
|---|
Labor-hours = minutes per occurrence × number of occurrences ÷ 60. You can enter opening work, closing work, cleaning, ordering, customer service, production, or anything else.
When does business pick up?
Optional: tap the hours when you’re busiest. A checked box ☑ means selected. If you're not sure, leave them blank.
Tap an hour: ☐ changes to ☑ when it is selected.
Checked hours are treated as busier than unchecked hours for this initial estimate. The tool does not assume specific customer counts by hour.
Try a staffing plan
Enter how many people you plan to have on duty during each hour. We’ll compare your plan with the estimated work. This is a first-pass coverage check, not a completed employee schedule.
| Hour | People planned | Model suggests* | Check |
|---|
*Suggestions round up the estimated labor-hours needed in each block. They are not automatically suitable shifts.
Turn your estimate into a practical labor plan.
Get your expanded report by email: your activity breakdown, hourly coverage gaps, cost comparison, and a focused plan for what to check next. The planner stays free to use.
How this staffing calculator estimates labor needs
For a practical walkthrough, read Before You Write the Schedule, List the Work.
Start with your public opening hours and the minimum number of people who must be on duty. Add each activity as minutes per occurrence multiplied by daily occurrences, divided by 60. The planner counts open-time work against available coverage before adding capacity, so tasks are not automatically counted twice.
Recurring work is spread evenly across public hours. Customer-driven work receives twice the weight in selected busy blocks, adjusted for block length. Before-opening and after-closing work is added separately. These are starting assumptions to replace with observation, not measured demand forecasts.
A worked example: a shop open 9 a.m. to 9 p.m.
Two people on duty for 12 hours create 24 person-hours of minimum coverage. Add one hour of opening preparation, 1.5 hours of closing work, two hours of open-time administration, and 150 orders taking six minutes each. Select 11 a.m., noon and 1 p.m. as busy hours.
The 15 hours of order work are weighted toward those three busy blocks. Combined with administration, each busy block needs about 2.17 labor-hours. The continuous estimate becomes 27 hours for the whole day, or $567 at $21 per hour.
The hourly table rounds up to three people in each busy block and two elsewhere: 27 hours while open, plus 2.5 hours before and after, or 29.5 hours and $620 rounded to the nearest dollar. The difference is rounding to whole people, not a calculation error. This fictional example matches the planner’s starting inputs; it is not a finished schedule.
Why can coverage be sufficient while work still gets missed?
Hours are not interchangeable. One person cannot serve a customer and complete a task that cannot be interrupted at the same moment. Check task deadlines, skills, breaks and actual arrivals with your team before relying on the estimate.
Does the estimate include breaks and overtime?
Break coverage, overtime premiums, absences and shift constraints are not automatically added. The cost estimate includes employer taxes or benefits only if you include them in the hourly rate you enter. Build those details into your final employee schedule.
What should I measure after trying the plan?
Compare a week of actual paid hours with customer volume, wait times, unfinished work and overtime. Update the largest task estimates first. Then use the labor cost percentage and productivity calculator to see how labor spending relates to revenue.